Al Mafraq Hospital, Abu Dhabi

Terrain PVC-u Above Ground Drainage Systems were specified and installed due to the homogenous nature of the Terrain's jointing system and stringent demands of material throughout the development.

The hospital comprises some 690 beds, a 3 storey out patient building, a 3 storey podium building to include diagnostics, operating theatres, emergency room, rehabilitation, intensive care unit and maternity unit, and 2 nine storey and 2 eleven storey inpatient towers.

Working closely with consultants Burt Hill and contractors Al Habtoor Leighton and Murray & Roberts, Terrain PVC-u Above Ground Drainage Systems were specified and installed due to the homogenous nature of the Terrain's jointing system and stringent demands of material throughout the development.

Get in touch to find out how Polypipe can help your project. 
Tel: +971 (0) 4 518 3000
Email: middleeast@polypipe.com

Related products

Terrain Above Ground Drainage

Globally respected for its international accreditation and durable solvent weld jointing methods, the Terrain PVC-u above ground drainage system has b